SETAC – South Etobicoke Transit Action Committee

Waterfront Reset Info – Improving Lake Shore Blvd West Transit

https://www.thestar.com/news/gta/transportation/2016/05/25/waterfront-reset-examines-way-to-extend-transit-to-new-neighbourhoods-along-the-lakeshore.html

The South Etobicoke section from this article:

“Segment 1: Long Branch to Humber River

The boldest option under consideration is upgrading the existing streetcar line on Lake Shore Blvd. West, which runs in mixed traffic, to an LRT line with its own right-of-way. Another alternative would see the TTC simply add service to the streetcar line and connecting north-south bus routes. Running an LRT along The Queensway was also considered, but the option was discarded because it wouldn’t provide links to GO and MiWay service.”

Full Waterfront Reset Public Presentation Slides:

http://www.waterfrontoronto.ca/uploads/documents/waterfront_transit_reset_study___final_presentation_may_25_2016_1.pdf

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.